Thursday, June 12, 2008

Winter Project

The Tiger is dismantled at home and some upgrades are happenning.

The wand and pushrods are being replaced with lighter stuff and the conduit through the foredeck is being replaced with a carbon tube which better aligns with everything for significantly less friction.

The flex skin flap hinge has to go, as it has become very stiff as the resin has aged, a shame but it was worth the experiment. Might try it again someday with more research into suitable resins.

Planning a better fit for the fin case cassette which makes up the space between the old 200mm wide centreboard shape and the 120mm wide foil strut size. Similar treatment needed on the rudder box and gudgeon fittings.

After sailing Dave's boat briefly its easy to see how importat all this is and how slack I have been with tidying up the mechanism and set up generally.

Once all that is finished a new better set of foils is on the menu.